No contractor can see inside your walls. Once demolition starts, Florida remodels regularly turn up problems nobody could have priced in advance. How you and your contractor handle those surprises decides whether a project stays on budget and on good terms.
Need a contractor for this project?Find a Contractor
A change order is a written amendment to your contract that describes the change, its price and its effect on the schedule. A good process:
Our contract checklist includes the change order clauses to look for.
Some discoveries change the project: structural damage, widespread termite damage or, in a flood zone, costs that push the project toward the FEMA 50% threshold. Pause, get professional advice and update the plan rather than pushing ahead. For a worked example of the 50% line on a Brevard County remodel, see whole-house remodel cost in Melbourne.
For cost context, see the bathroom remodel and roof replacement cost guides. For Melbourne and Brevard County figures, see bathroom remodel cost in Melbourne.
That depends on your contract and the circumstances, which is why contracts should require written, signed change orders before extra work starts. If there's a dispute, keep your records and get legal advice.
Ask the contractor to show you the damage before it's repaired, take photos and, for larger items, ask for an explanation of why it must be fixed. A reputable contractor will be happy to show you.
Sometimes. If the change affects structure, plumbing, electrical or other permitted work, the permit may need a revision. Ask your contractor.
Need a contractor for this project?Find a Contractor
We summarize official information in our own words and link to the source. Requirements can change, so confirm details with the source before relying on them. Our editorial standards
Renovation Guides
How much to set aside for surprises on a Florida remodel, what a contingency should cover, and the Florida-specific costs that are not contingency at all.
Renovation Guides
What a Florida renovation contract should include: lien and Recovery Fund notices, inspection-based payments, change orders, permits and storm delays.
Renovation Guides
A checklist for preparing a Florida home for remodeling: dust, pets, pools, lead and asbestos testing, HOA notices, insurance and storm plans.
Project Costs
What a bathroom remodel costs in Florida, from a cosmetic refresh to a full primary bath, plus tub-to-shower conversions, glass and slab plumbing.
Project Costs
What a new roof costs in Florida per square foot and in total, for shingle, metal and tile, plus decking, wind-code upgrades and worked examples.
Renovation Guides
What to check before renovating an older Florida home: pipes, wiring, panels, asbestos, lead, termites, four-point inspections, flood rules and permits.
Project Costs
What a whole-house remodel costs in Melbourne and Brevard, with example budgets for a block home, hidden costs, permits, phasing and the 50% flood rule.
Project Costs
Bathroom remodel prices in Melbourne and Brevard County, with Florida ranges, published local figures, slab plumbing costs, example budgets and permits.