What commonly hides behind walls, floors and roofs in Florida homes, how change orders should work, and how to protect your budget when surprises show up.
Renovation Guides
How much to set aside for surprises on a Florida remodel, what a contingency should cover, and the Florida-specific costs that are not contingency at all.
Every experienced contractor has a story about what they found behind a wall or under a roof. A contingency is the money you set aside so that story doesn't derail your project.
Set aside 10% to 20% of your construction budget for unexpected costs. It's a widely used planning guideline, not a law, and where you land depends on the project.
| Situation | Suggested contingency |
|---|---|
| Newer home, cosmetic work (paint, flooring, cabinets in place) | About 10% |
| Typical bathroom or kitchen remodel | About 15% |
| Older home, reroof, wall removal, plumbing changes, additions | 20% or more |
If your house is older, our guide to renovating an older Florida home covers what to check before you settle on a number.
See change orders and hidden damage for how these usually show up.
Need a contractor for this project?Find a Contractor
Upgrades you decide on mid-project, such as better tile, a bigger island or extra lighting, aren't surprises. Budget for them separately, or decide before you sign.
Plan these as their own line items:
For the overall plan, see renovation timelines and common renovation mistakes in Florida. For project prices, browse our cost guides. Our cost guides for a bathroom remodel in Melbourne and a whole-house remodel in Melbourne show a contingency added to example budgets.
You don't need to share the amount. What matters is that the contract sets out how hidden conditions and changes are priced, so any use of the contingency is documented and fair.
Great. Keep it until the final inspection and punch list are done, then decide whether to spend it on extras or keep it.
No. An allowance is a budget in the contract for items you haven't chosen yet, like tile or fixtures. A contingency is your own reserve for surprises.
We summarize official information in our own words and link to the source. Requirements can change, so confirm details with the source before relying on them. Our editorial standards
Renovation Guides
What commonly hides behind walls, floors and roofs in Florida homes, how change orders should work, and how to protect your budget when surprises show up.
Renovation Guides
What a Florida renovation contract should include: lien and Recovery Fund notices, inspection-based payments, change orders, permits and storm delays.
Renovation Guides
Common, costly remodeling mistakes in Florida, from unlicensed contractors and skipped permits to ignored flood zones, HOA rules and missing lien releases.
Renovation Guides
Realistic timelines for Florida remodels, from roofs and impact windows to kitchens and additions, with permits, HOA review and hurricane season.
Project Costs
Estimated costs for common remodeling and home improvement projects in Florida.
Renovation Guides
What to check before renovating an older Florida home: pipes, wiring, panels, asbestos, lead, termites, four-point inspections, flood rules and permits.
Project Costs
Bathroom remodel prices in Melbourne and Brevard County, with Florida ranges, published local figures, slab plumbing costs, example budgets and permits.
Project Costs
What a whole-house remodel costs in Melbourne and Brevard, with example budgets for a block home, hidden costs, permits, phasing and the 50% flood rule.